Drainage and Stormwater
Stormwater Quality Improvements
Project Summary
This project provides stormwater infrastructure to remove pollutants from stormwater runoff before it reaches Saint Joseph Creek. A storm structure on Burlington and Mochel will be retro-fitted with a device to improve pollutant removal. A new water quality structure will be installed along Warren Ave between Highland Ave and Washington Ave.
LATEST UPDATE
July 11, 2025
Water quality structure is installed. Lot C and Warren Ave are open to traffic.
PAST UPDATES
July 4, 2025
Lot C along Warren Ave near Main Street station will have reduced parking during construction next week.
June 27, 2025
The water quality structure on Warren Ave will begin construction the week of July 7th.
May 30, 2025
The water quality structure is expected to be installed in July.
May 16, 2025
- A new water quality structure will be delivered to Public Works. This structure will be installed along Warren Ave between Highland Ave and Washington Ave.
- Expect parking along the track at Lot C to be affected during construction.
Resources
Project #: SW-073
Start: March 2025
End: June 2025