Table 1: Project completion and contact information.
Start Date October 2010
End Date January 2011
Percent Completed 100%
Village Contact William Lorton,Transportation Manager, (630) 434-6863

Project Summary

The purpose of the project is to thoroughly study traffic issues in the neighborhood bounded by Main Street, Fairview Avenue, Maple Avenue and 55th Street.   The goal is to alleviate issues caused by speeding, cut-though traffic, pedestrian/traffic conflicts and intersection controls.

A detailed study of the intersection at 55th and Washington Streets will also be undertaken as part of the project.  This will involve a thorough investigation of conditions that may be contributing to vehicle accidents at this location and recommendations for mitigating those accidents.    

The Village authorized contractor for the project is KLOA, Inc. of Rosemont, Il.  Data collection and analysis will include temporary electronic traffic counters as well as manual pedestrian and vehicular counts at intersections.  Roadway measurements, intersection layouts and parking data will also be examined.

Related Docs

Updates

4/20/11 Following the January 26, 2011 Public Meeting, staff conducted additional field checks, met with residents, and made adjustments to the proposed study recommendations.The 2010 Neighborhood Study (Study) was then presented to the Transportation and Parking (TAP) Commission on March 9, 2011.   The TAP Commission voted unanimously to approve the study's short-term recommendations which consist of traffic control changes to STOP, YIELD locations and also to school crossing and pedestrian crossing locations within the study area. 

The Study was formally presented to the Village Council on April 12, 2011 for initial discussion and dialogue and approved by the Council on April 19, 2011.

Village staff will be scheduling the installation of STOP and YIELD signs to begin on April 25, 2011.  The locations are as follows: 

SEE MAP

  • New YIELD sign on Summit St at Blodgett Ave (EB)
  • New YIELD sign on Farley Pl at Lyman Ave (WB) and at Park Ave (EB)
  • New YIELD signs on Webster St. at Summit St (NB and SB both) 
  • New STOP sign on Grand Ave at Burlington Ave
  • New STOP signs on Park Ave at Randall St (All-Way)
  • New STOP signs on Hill St. at Blodgett Ave (All-Way)
  • New STOP signs on Lyman Ave at Summit St (All-Way)
  • New STOP sign on Elmwood Ave at Randall Ave (SB)
  • New STOP sign on Randall Ave at Elmwood Ave (EB)
  • New STOP sign on Webster St. at Randall Ave (NB)
  • New STOP signs on Grand Ave at Hill St. (All-Way)
  • Change STOP direction on Randall St. at Benton Ave to stop North-South
  • Change STOP direction on Randall St. at Fairmount Ave to stop North-South

1/7/2011 The Village will be conducting a Neighborhood Meeting on January 26, 2011, 7:00 PM, at Whittier Elementary School, 536 Hill Street. The purpose of the meeting is to present preliminary study findings to the neighbors, and to receive public comments and suggestions. Village Staff will be in attendance along with our Traffic Consultant to discuss any specific concerns within the study area. The study area is bounded by 55th Street, Fairview Avenue, Maple Avenue, and Main Street.

11/16/2010 Traffic data collection for the 2010 Neighborhood Traffic Study has been completed by way of electronic modules attached to the pavement. In addition,  the Village's traffic consultant conducted pedestrian intersection counts, surveyed existing traffic controls and measured intersection geometry.

Next actions include a meeting with staff to discuss data collection efforts to date. Following that meeting, a neighborhood meeting is anticipated with the Transportation and Parking (TAP) Commission in early January 2011, where residents can listen to the project findings and make comments and suggestions for improvements.