Skip to main content

Butterfield Road (IDOT Project)

Project Summary

The Illinois Department of Transportation patching and resurfacing project on Butterfield Road (IL 56) in Downers Grove, Lombard, and Oak Brook will require daytime lane closures. The project limits are from Interstate 355 in Downers Grove, to 22nd Street in Oak Brook. In order to complete the work, traffic will be reduced to one lane in each direction, with left turn lanes being maintained between 7 a.m. and 5 p.m. The road will be fully open to traffic at the end of each day. Access to businesses will be maintained during construction. The project is expected to be complete by the end of September, 2019.

Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits, and be on the alert for workers and equipment.

Project Alerts

Link to IDOT Butterfield Road Resurfacing Information

Recent Progress